ATC has reposted its “Rate Projections” through 2017, its projected 2013 Point-to-Point Rates (Schedules 7 & 8) and Attachment O (Schedule 9). These changes are due to updated coincident load data received from its customers. The load change does not result in any change to ATC’s projected annual revenue requirement. ATC has also reposted its projected 2013 Attachment GG (Schedule 26) with a minor revision. This revision does not change the total revenue requirement of $73.4 million, but rather only changes the allocation of charges for ATC RECB projects relative to the entire MISO footprint. ATC expects the revised allocation to result in less than $7,000 in additional costs to the ATC Zone.
Rate Formula (Attachment O)
2013 Attachment GG
2013 Transmission Service Rates (Schedule 7 & 8)
ATC Rate Projections through 2017
If you have any questions, please contact Mike Degenhardt (mdegenhardt@atcllc.com) or Bob Rusch (brusch@atcllc.com).
Tom Finco
Vice President, External Relations
ATC will host a customer teleconference/web-conference to discuss the 2013 Budget on Wednesday, October 3, 2012 at 2:00 p.m. (CST). The 2013 Budget will be presented and customers will have an opportunity to discuss the budget information during this time. We have planned this single meeting for review of the budget materials to meet the needs of all customers. We encourage you to extend this invitation to all appropriate staff in your organization. The participation information is included below.
Dial In Number: (866) 621-2153
Access Code: 4003177
Web Meeting Address: https://www.webmeeting.att.com
Meeting Number: 8666212153
Access Code: 4003177
All available information on the 2013 Budget and Rates has been posted below to provide our customers with an equal opportunity to review the documents.
Budget Presentation
Rate Formula (Attachment O)
2013 Attachment GG
2013 Attachment MM
2013 Transmission Service Rates (Schedule 7 & 8)
ATC Rate Projections through 2017
Tom Finco
Director, External Relations
ATC released its 2011 Actual Network Revenue Requirement Calculation and Reconciliation to Actual Billed Network Revenues (“True-Up”) on June 1, 2012. The actual network revenue requirement was approximately $8.928 million less than the forecasted revenue requirement that was billed in 2011.
The details of the calculation are included in the following attachment.
If you have questions, please contact Bob Rusch, Director – Finance & Accounting, at brusch@atcllc.com or by phone at (262) 832-8637.
FERC recently approved a filing that slightly changes the projected 2012 revenue requirement for MVP projects. As a result, ATC had to refile its attachment MM with MISO. The impact was a reduction in attachment MM of $43,450. This reduction also results in an increase in revenue requirement for attachment O by a similar $43,450. Due to these minor changes, ATC is now reposting the attachments with the updated revenue requirements.
Rate Formula (Attachment O)
If you have questions, please contact Bob Rusch, Director – Finance & Accounting, at brusch@atcllc.com or by phone at (262) 832-8637.
Tom Finco
Before the end of October, ATC plans to propose new depreciation rates, with an effective date of January 1,2012, for its facilities in a FERC rate filing. Based on a depreciation study to be submitted to FERC, ATC’s 2012 revenue requirement is estimated to increase by $248,000.
For questions regarding the filing, please contact Mal Bertsch at (262) 506-6736 or by email at mbertsch@atcllc.com.
As indicated in the previous budget posting, the presentation that will be reviewed on the October 10, 2012 Budget, conference call is now available.
Tom Finco
Please find the links to ATC's 2012 Budget and Rates below. This information is posted in order to provide our customers with an equal opportunity to review the documents.
ATC will host a teleconference/web-conference to discuss the 2012 Budget on Monday, October 10, at 2:30 p.m. (CST). The 2012 Budget will be presented in detail and customers will have an opportunity to discuss the budget information. We have planned this single meeting for review of the budget materials to meet the needs of all customers. This meeting will be very comprehensive and we encourage you to extend this invitation to all appropriate staff in your organization. Participation information is as follows.
Dial In Number: (866) 621-2153
Web Meeting Address: https://www.webmeeting.att.com
Rate Formula (Attachment O)
Please note that the Budget Presentation reviewed during this call will be posted by Tuesday, October 4, 2011.
Please indicate your participation to Marcia Louden at mlouden@atcllc.com.
Tom Finco
ATC released its 2010 Actual Network Revenue Requirement Calculation and Reconciliation to Actual Billed Network Revenues (“True Up”) on June 1, 2011. The actual network revenue requirement was approximately $10.716 million less than the forecasted revenue requirement that was billed in 2010.
In accordance with ATC’s tariff and Attachment O, ATC is currently refunding these amounts, plus accrued interest, in its 2011 monthly network billings. The details of the calculation are included in the following attachment.
If you have questions, please contact Bob Rusch, Director – Finance & Accounting, at brusch@atcllc.com or by phone at (262) 832-8637.
ATC released its 2009 Actual Network Revenue Requirement Calculation and Reconciliation to Actual Billed Network Revenues (“True Up”) on June 1, 2010. The actual network revenue requirement was approximately $972 thousand more than the forecasted revenue requirement that was billed in 2009.
In accordance with ATC’s tariff and Attachment O, ATC will collect these amounts, plus interest, in its 2011 monthly network billings. The details of the calculation are included in the following attachment.attachment.
If you have questions, please contact Bob Rusch, Director – Finance & Accounting, at brusch@atcllc.com or by phone at (262) 832-8637.
Listed below please find the links to ATC’s 2011 Attachment O & Attachment GG, incorporating the new Attachment GG template approved by the FERC on December 3, 2010. As a result, revisions have been made to Schedules 7 & 8 and are included below for your reference.
Rate Formula (Attachment O)
If you have questions, please contact Bob Rusch, Director – Finance & Accounting, at brusch@atcllc.com or by phone at (262) 832-8637.
Tom Finco
Listed below please find the links to ATC's 2011 Attachment GG. This information was posted to OASIS on October 19, 2010 in order to provide our customers with an equal opportunity to review the documents.
ATC posted 2011 Budget and Rates information on October 1, 2010. Subsequently, an error was discovered on page 6, line 15, of the 2011 Budget Presentation related to the 2009 Network True-up which impacts the 2011 revenue requirement. As filed on October 1, the amount of the Network True-up was $977,000. The amount should have been $371,000. The revised presentation shows the correct 2009 Network True-up amount. As a result of this change, the 2011 projected network billed revenue requirement will decline from $500.1 million to $499.5 million.
As a result of this correction revisions have been made to Schedules 7 & 8 as well as the ATC Rate Phase-in and Projections through 2015. Links to the revised documents are included below for your reference.
2011 Transmission Service Rates (Schedule 7 & 8)
Tom Finco
Listed below please find the links to ATC's 2011 Budget and Rates. This information is posted in order to provide our customers with an equal opportunity to review the documents.
ATC will host a customer meeting to discuss the 2011 Budget on Wednesday, October 13, 2010, from 10-11am. The 2011 Budget will be presented in detail and customers will have an opportunity to discuss the budget information. We have planned this single meeting for review of the budget materials to meet the needs of all customers. This meeting will be very comprehensive and we encourage you to extend this invitation to all appropriate staff in your organization.
This meeting is offered as a teleconference/web meeting only. The participation information is as follows.
Dial In Number: (866) 621-2153
Web Meeting Address: https://www.webmeeting.att.com
Please indicate your participation and direct any questions to Marcia Burbach at mburbach@atcllc.com.
We look forward to seeing you on Wednesday.
Tom Finco
Rate Formula (Attachment O)
ATC released its 2009 Actual Network Revenue Requirement Calculation and Reconciliation to Actual Billed Network Revenues (“True Up”) on June 1, 2010. The actual network revenue requirement was approximately $368 thousand more than the forecasted revenue requirement that was billed in 2009.
In accordance with ATC’s tariff and Attachment O, ATC will collect these amounts in its 2011 monthly network billings. The details of the calculation are included in the following attachment.
ATC has posted below updated Rate Formula (Attachment O), 2010 Transmission Service Rates (Schedule 7&8) and ATC Rate Phase-in and Projections through 2014 on Friday, February 5. Please note these updates were made to the 2010 Budget files previously posted in Fall 2009.
Please contact your regional manager with any questions. Thank you.
Tom Finco
Rate Formula (Attachment O)
Listed below please find the links to ATC's 2010 Budget and Rates. This information is posted in order to provide our customers with an equal opportunity to review the documents.
ATC will host a customer meeting to discuss the 2010 Budget on Wednesday, October 7, from 9:30am-10:30am at ATC's Pewaukee office. The 2010 budget will be presented in detail and customers will have an opportunity to discuss the budget information. We have planned this single meeting for review of the budget materials and encourage you to extend this invitation to all appropriate staff within your organization.
A teleconference option is available for this meeting. The dial-in information is as follows.
We look forward to seeing you on Wednesday.
Tom Finco
Rate Formula (Attachment O)
In accordance with ATC’s tariff and Attachment O, these amounts are being refunded to network customers in 2009 monthly billings. The details of the calculation are included in the following attachment [updated on 10/6/09, 11/5/09, and 12/17/09]
ATC has posted below updated Rate Formula (Attachment O), 2009 Transmission Service Rates (Schedule 7&8) and ATC Rate Phase-in and Projections through 2013 on Monday, February 2. Please note these updates were made to the 2009 Budget files previously posted in Fall 2008.
Please contact your regional manager with any questions. Thank you.
Tom Finco
Rate Formula (Attachment O)
Listed below please find the links to ATC's 2009 Budget and Rates. This information is posted in order to provide our customers with an equal opportunity to review the documents.
ATC will host a customer meeting to discuss the 2009 Budget on Tuesday, October 7 from 9-10am at ATC's Pewaukee office. The 2009 Budget will be presented in detail and customers will have an opportunity to discuss the budget information. We have planned this single meeting for review of the budget materials to meet the needs of all customers. This meeting will be very comprehensive and we encourage you to extend this invitation to all appropriate staff in your organization.
A teleconference option is available for this meeting. The dial-in information is as follows.
Please indicate your participation either in person or via phone to Terry Peterson, tpeterson@atcllc.com.
We look forward to seeing you on Tuesday.
Tom Finco
Rate Formula (Attachment O)
2012 Attachment GG
2012 Attachment MM
2012 Transmission Service Rates (Schedule 7 & 8)
ATC Rate Projections through 2016
Director, External Relations
Director, External Relations
Access Code: 4003177
Meeting Number: 8666212153
Access Code: 4003177
2012 Attachment GG
2012 Attachment MM
2012 Transmission Service Rates (Schedule 7 & 8)
ATC Rate Projections through 2016
Director, External Relations
2011 Attachment GG
2011 Transmission Service Rates (Schedule 7 & 8)
ATC Rate Projections through 2015
Director, External Relations
ATC Rate Projections through 2015
Budget Presentation
If you have questions, please contact Bob Rusch, Director – Finance & Accounting, at brusch@atcllc.com or by phone at (262) 832-8637.
Director, External Relations
Access Code: 4003177
Meeting Number: 8666212153
Access Code: 4003177
Director, External Relations
2011 Transmission Service Rates (Schedule 7 & 8)
ATC Rate Projections through 2015
Budget Presentation
Director of External Relations and Policy
2010 Transmission Service Rates (Schedule 7 & 8)
ATC Rate Phase-In and Projections through 2014
Dial In Number: (866) 621-2153
Access Code: 4003177
Please indicate your participation either in person or via phone and direct any questions to Marcia Burbach at mburbach@atcllc.com.
Director, External Relations and Policy
2010 Transmission Service Rates (Schedule 7 & 8)
ATC Rate Phase-In and Projections through 2014
Budget Presentation
ATC released its 2008 Actual Network Revenue Requirement Calculation and Reconciliation to Actual Billed Network Revenues (“True Up”) on June 1, 2009. The actual network revenue requirement was approximately $15.5 million [revised to $16.1 million, October 6, 2009] less than the forecasted revenue requirement that was billed in 2008. The difference is primarily due to lower preliminary survey and investigation costs during 2008 as compared to budget and higher point-to-point revenues received during 2008 as compared to budget.
Director of External Relations and Policy
2009 Transmission Service Rates (Schedule 7 & 8)
ATC Network Rate Projections through 2013
Dial In Number: (866) 621-2153
Access Code: 3749584
Director, External Relations and Policy
2009 Transmission Service Rates (Schedule 7 & 8)
ATC Rate Phase-In and Projections through 2013
Budget Presentation