American Transmission
Company Standards of Conduct Information
Emergency deviations (emergency circumstances that affect system reliability)
1/16/06: As of 15:30 CST, the emergency reported below was resolved and
Standards of Conduct were reinstated.
1/16/06: ATC has suspended their
Standards of Conduct associated with the Wausau, WI area transmission system as
a result of a forced outage to the Weston-Rocky Run 345 kV line. This forced
outage, in conjunction with other outages in the area, result in the need for
effective load curtailment to maintain system reliability. This suspension is
effective 11:03 CST.
Incidents of disclosure of information
Posted on
9/29/11
An Affiliate has brought to the attention of American Transmission
Company LLC the possible disclosure of non-public transmission function
information to a marketing function employee. A transmission function employee
at American Transmission Company LLC exchanged and discussed transmission and
generator outage related information with an employee of an Affiliate who is not
a marketing employee. The information provided regarded a planned substation
outage scheduled for 2013 which would potentially constrain the output from a
generating station owned by the Affiliate. The outage related information was
subsequently discussed between additional employees at the Affiliate and it is
believed the information was erroneously shared with a marketing function
employee of the Affiliate. The subject outage information is considered
non-public transmission function information and disclosure to a marketing
function employee is contrary to the Standards of Conduct.
Posted on 9/26/11
An Affiliate has brought to the attention of American
Transmission Company LLC the possible disclosure of non-public transmission
function information to a marketing function employee. A draft data request
response associated with a rate proceeding filing, which was circulated
internally at the Affiliate for review, was erroneously provided to a marketing
function employee of the Affiliate. The draft data request response included a
very brief summary of a MISO Operating Guide which defines how generating units
at a specific power plant would be dispatched under certain transmission
constraints. This information is considered non-public transmission function
information and disclosure to a marketing function employee is contrary to the
Standards of Conduct.
Posted on 2/18/11 at request of Integrys/Wisconsin Public Service:
On
February 18, 2011 at approximately 3:30pm Central Time, there was an improper
disclosure of non-public transmission function information by a transmission
function employee to a marketing function employee. At a joint meeting that
included the transmission function employee and the marketing function employee,
the transmission function employee inadvertently disclosed the outage of a 138
kV transmission line located in the Western UPPCO service territory and
indicated that the line was expected to return to service in about 1 hour. The
transmission function employee’s disclosure was based on information received
from American Transmission Company, LLC (ATC). After the disclosure occurred,
the joint meeting was immediately concluded and Integrys investigated the
disclosure. Integrys contacted ATC concerning the improper disclosure and
completed this posting required by the Commission’s regulations.
American
Transmission Company LLC's Supplemental Compliance Filing
ATCLLC will
make available the EMS alarm data dating from January 1, 2001 through March 8,
2002 on a compact diskette to any entity that requests a copy. Any requests for
this data should be made to
Dave Mueller at ATCLLC.
Phone: 262-506-6813
E-Mail: dmueller@atcllc.com
ATC Standards of Conduct postings
Voluntary consent to share transmission customer's non-public
information with marketing function employees
Nothing to post at this
time.
Written SOC procedures including compliance plan
American
Transmission Company LLC FERC Standards of Conduct Compliance Plan Updated:
11/26/08
Names and addresses of affiliates with marketing function
employees
Alliant Energy
4902 North Biltmore Lane, Madison, WI
53707-1007
Edison Sault Electric Company
725 East Portage Avenue
Sault Ste.
Marie, MI 49783
Integrys Energy Services, Inc.
1716 Lawrence Drive
De Pere, WI 54115
Integrys Energy Services of Texas, Inc.
1001 Fannin Street, Suite
#1150
Houston, TX 77002
Madison Gas and Electric Co.
133 S. Blair St., Madison, WI 53703
Manitowoc Public Utilities
1303 S. 8th Street, Manitowoc, Wisconsin
54221-1090
Peoples Energy Resources Corporation
500 West Madison St.
Suite
3300
Chicago, IL 60661
Upper Peninsula Power Company
600 East Lakeshore Drive, Houghton, MI 49931
Wisconsin Energy
231 W. Michigan St., Milwaukee, WI 53203
Wisconsin Public Power Inc.
1425 Corporate Center Drive, Sun Prairie, WI
53590-9109
Wisconsin Public Service Corp.
700 N Adams St, Green Bay, WI 54301
List of facilities, and their addresses, shared by ATC and its
affiliates
None
Job Descriptions
ATC
Transmission Function Employee Job Descriptions Updated: 6/8/10
Employee transfers
None at this time
Affiliate employee transfers
None at this time
Other information
Alliant Energy-WPL extracts a subset of
the following tables for month end processing from the American Transmission
Company, LLC. Information is all related to tie-line data (WPL's
interconnections) and is extracted for control area reporting (CAR). Information
is only extracted after-the-fact. HS stands for historical.