Emergency deviations (emergency circumstances that affect system reliability)
3/12/06: As of 0400 CST, the emergency reported below was resolved and Standards of Conduct were reinstated.
3/10/06: ATC has suspended its Standards of Conduct associated with the Wausau, WI area transmission system as a result of forced outages to the in the Wausau area. These forced outages, in conjunction with other outages in the area, result in the need for effective load curtailment to maintain system reliability. This suspension is effective 23:04 CST.

1/16/06: As of 15:30 CST, the emergency reported below was resolved and Standards of Conduct were reinstated.
1/16/06: ATC has suspended their Standards of Conduct associated with the Wausau, WI area transmission system as a result of a forced outage to the Weston-Rocky Run 345 kV line. This forced outage, in conjunction with other outages in the area, result in the need for effective load curtailment to maintain system reliability. This suspension is effective 11:03 CST.

Incidents of disclosure of information
Posted on 2/18/11 at request of Integrys/Wisconsin Public Service:
On February 18, 2011 at approximately 3:30pm Central Time, there was an improper disclosure of non-public transmission function information by a transmission function employee to a marketing function employee. At a joint meeting that included the transmission function employee and the marketing function employee, the transmission function employee inadvertently disclosed the outage of a 138 kV transmission line located in the Western UPPCO service territory and indicated that the line was expected to return to service in about 1 hour. The transmission function employee’s disclosure was based on information received from American Transmission Company, LLC (ATC). After the disclosure occurred, the joint meeting was immediately concluded and Integrys investigated the disclosure. Integrys contacted ATC concerning the improper disclosure and completed this posting required by the Commission’s regulations.

American Transmission Company LLC's Supplemental Compliance Filing
ATCLLC will make available the EMS alarm data dating from January 1, 2001 through March 8, 2002 on a compact diskette to any entity that requests a copy. Any requests for this data should be made to
Dave Mueller at ATCLLC.
Phone: 262-506-6813
E-Mail: dmueller@atcllc.com

ATC Standards of Conduct postings

Voluntary consent to share transmission customer's non-public information with marketing function employees
Nothing to post at this time.

Written SOC procedures including compliance plan
American Transmission Company LLC FERC Standards of Conduct Compliance Plan Updated: 11/26/08

Names and addresses of affiliates with marketing function employees
Alliant Energy
4902 North Biltmore Lane, Madison, WI 53707-1007

Edison Sault Electric Company
725 East Portage Avenue
Sault Ste. Marie, MI 49783

Integrys Energy Services, Inc.
1716 Lawrence Drive
De Pere, WI 54115

Integrys Energy Services of Texas, Inc.
1001 Fannin Street, Suite #1150
Houston, TX 77002

Madison Gas and Electric Co.
133 S. Blair St., Madison, WI 53703

Manitowoc Public Utilities
1303 S. 8th Street, Manitowoc, Wisconsin 54221-1090

Peoples Energy Resources Corporation
500 West Madison St.
Suite 3300
Chicago, IL 60661

Upper Peninsula Power Company
600 East Lakeshore Drive, Houghton, MI 49931

Wisconsin Energy
231 W. Michigan St., Milwaukee, WI 53203

Wisconsin Public Power Inc.
1425 Corporate Center Drive, Sun Prairie, WI 53590-9109

Wisconsin Public Service Corp.
700 N Adams St, Green Bay, WI 54301

List of facilities, and their addresses, shared by ATC and its affiliates
None

Potential merger partners
The following appeared in the third quarter Form 10-Q filed by Allete, Inc. with the U.S. Securities and Exchange Commission:

“ATC is a for-profit transmission-only company created by the transfer of transmission assets previously owned by several electric utilities serving the upper Midwest. In April 2003, the PSCW approved a transfer of interests in the Wausau-to-Duluth electric transmission line project to ATC. As a result, ATC has assumed primary responsibility for the overall management of the project and will own and operate the completed Wausau-to-Duluth line. We have a contractual opportunity related to ATC that, if exercised, would ultimately result in our having an equity investment in ATC. We intend, if approved by other parties, to invest $60 million in ATC by the end of 2006.”

Based on preliminary analysis, ATC Board approval of Allete's membership is required.

Job Descriptions
ATC Transmission Function Employee Job Descriptions Updated: 6/8/10

Employee transfers
None at this time

Affiliate employee transfers
None at this time

Other information
Alliant Energy-WPL extracts a subset of the following tables for month end processing from the American Transmission Company, LLC. Information is all related to tie-line data (WPL's interconnections) and is extracted for control area reporting (CAR). Information is only extracted after-the-fact. HS stands for historical.

  • CAR_MAPP_ONPEAK (once on 3rd working day)
  • CAR_METER_DATA (once on 3rd working day)
  • CAR_METERS (once on 3rd working day)
  • CAR_PA_MONTHLY (3rd working day, then on demand)
  • HS_TIE_LINE (once on 1st working day)
  • HS_TIE_LINE_HOURLY (1st working day, 3rd working day, then on demand)
    This information is available upon request.

    If you have questions about any of the material on this page please contact Doug Johnson at dfjohnson@atcllc.com or 262-506-6863.